AI-Guided Robotic Fabrication · San Antonio, TX

The fabrication cell that programs itself.

Lodestar cells scan raw stock, generate their own toolpaths, and weld, cut, and finish production parts — no robot programmer on staff, no months of integration. Built for metal shops with more work than machinists.

  • 3.4× machine-on time
  • First parts in 14 days
  • $0 upfront hardware
  • 24/7 remote monitoring

Averages across active Lodestar fleets, trailing 12 months. Your numbers depend on part mix — we'll model yours in the demo.

Video slot — cell running autoplay muted loop · 16:10 cover · ≤10s weld pass · poster set

The math every shop owner already knows

The work is there. The hands aren't.

Order books are full and quoting is brutal anyway — because every job you win still has to get past the same bottleneck: skilled fabricators you can't hire fast enough. The shops that grow through the next decade won't out-recruit the shortage. They'll out-automate it.

56

Average age of a certified welder-fabricator

Half the trade retires inside 12 years — and enrollment in fab programs isn't close to replacing them.

2.4:1

Open fabrication roles per qualified applicant

Poaching wages keep climbing. Training your own takes years — and they're recruited the day they're good.

7 wks

Typical quote-to-delivery backlog at capacity

Long lead times quietly hand your best customers a reason to qualify a second vendor.

The Lodestar system

One cell. Three moves.

A Lodestar cell works the way your best fabricator does — look at the part, think it through, run the pass — except it does the thinking in milliseconds, holds sub-millimeter accuracy on pass ten thousand, and never gets pulled onto another job.

01 / SCAN

See the real part

Structured-light cameras capture the raw stock and fixture in under four seconds — as it actually sits, not as the drawing wishes it did. Warp, gap, and fit-up variance are measured, not assumed.

02 / PLAN

Plan the path

TrueNorth™, our fabrication planner, generates the full toolpath — sequence, torch angles, feeds — and clears reach and collision checks before an arc ever strikes. No teach pendant, no offline programming seat.

03 / FABRICATE

Run — and adapt

The cell executes while sensors watch every pass, trimming feed and torch parameters in real time. Anything drifting out of tolerance is flagged before it leaves the cell — not found at final inspection.

The whole loop — scan, plan, first arc — takes less time than reading this section. Your team loads parts and approves plans from a tablet; ours watches fleet health around the clock from San Antonio. Watch it run on your drawings.

Fleet results

98.4%

First-pass yield

across all production cells

1.8M+

Production parts delivered

from customer cells since 2023

37%

Avg. cost-per-part reduction

measured against pre-Lodestar baselines

Fleet telemetry, trailing 12 months. Per-shop results in every demo — with the shop's permission, not cherry-picked.

Video slot — cells in action muted loop · 16:9 cover · lazy data-src · ≤10s floor footage

Second shift at Hill Country Steelworks — one operator, three cells

Who runs Lodestar

From the front office to the floor.

“We quoted a job we'd have turned down flat last year — 1,100 weldments on a three-week window. The cell ran nights and weekends and we delivered four days early. That one PO paid for the quarter.”

Marcus Treviño VP of Operations, Hill Country Steelworks — New Braunfels, TX

“Honestly, I thought it was here to replace me. Turns out it's here to run the four hundred boring ones so I can put my hands on the twelve hard ones. I check its work on a tablet. It's never once checked mine.”

Denise Okafor Lead Fabricator, Rio Metalworks — Laredo, TX

Where cells are running

Built for the shops that build everything else.

Structural

Structural & misc. steel

Beams, embeds, stairs, and rail — high-mix weldments where fit-up never matches the model. Scanning first is the whole trick.

11 cells in the field

Energy

Energy & pipeline

Skids, spools, and pressure weldments with full per-pass parameter logs — traceability your QA team stops chasing by hand.

100% pass-level weld records

Heavy equipment

Heavy equipment & ag

Thick-plate buckets, frames, and booms. Long seams and heavy deposition are where around-the-clock arc time pays fastest.

3.9× deposition vs. manual shift

Job shops

Contract & job shops

Lot sizes of five, fifty, or five hundred. Self-programming means changeover is a scan, not a week of robot programming.

<20 min typical changeover

Book a demo

See your parts run.

Bring us three drawings. In a 45-minute working session we'll model cycle times, cost per part, and payback for your exact mix — then show you a live cell running comparable work. No slideware, no obligation.

Within driving distance? Come see the demo floor at our San Antonio facility — steel toes provided.

Prefer to talk first? Call (210) 555-0184, Mon–Fri 8am–6pm CT. You'll get an applications engineer, not a script.

An applications engineer replies within one business day.